Public Works


building



          


             Jeff Avery
                 Director

                 

                    Amber Valles
                      Department Coordinator 
                  
                  7613 W. Dunn Street
                    Odessa, Texas 79761
                  Phone (432) 381-0098

                      OFFICE HOURS:
                     Administration & Engineering:
                       8:00 a.m. - 5:00 p.m. [Monday – Friday]

                                  Road Maintenance and Traffic Operations Sections
                          7:00 a.m. - 5:30 p.m. [Monday – Thursday

                             

 SUBMIT A WORK ORDER 

 you may also contact us at (432) 381-0098 to submit a request

Ector County does not maintain public roads that are not part of the Ector County road system. FM and State Highways are maintained by Texas Department of transportation (TxDOT). Other roads are maintained (repaired) by the corresponding municipalities; (i.e., The City Of Odessa) except for private roads.

Ector County Web Map Portal

 


 

Permian Basin Metropolitan Planning Organization
Interregional Planning & Environmental Linkage Study 

 


About Us


The Ector County Public Works Department is responsible for maintenance approximately 552 miles of paved roadway and 33 miles of caliche/unpaved roadway. Our core services and divisions are: Road Maintenance Section, Traffic Operations Section, Engineering Section, Airport Maintenance Section, Equipment Services Section, and Parks.

Our Vision: Committed to excellence by being the department of innovation and quality road maintenance services.

Our Mission: Provides an effective, systematic approach to the care and maintenance of Ector County roads, fleet, parks, and airport as well as provide services and support to communities and agencies in the County. In fulfilling this mission, we are proud of our employees who provide superior dedication to ensure public safety as a priority. 




   
Road Maintenance Section 
Supervisor: 
Manuel Carrillo
      
Services:

¨Constructs new roads

¨Repairs and preserves existing roads

¨Grading and shaping gravel roads and drainage ditches

¨Mowing & cutting brush

¨Picking up trash along roadsides and R.O.W.

¨Maintaining driveway and mailbox approaches



Engineering Section
Lead Specialist:
Eddie P. Vasquez 

                Services:
¨Reviewing R.O.W and relocating utilities as needed for County projects

¨Issuing addresses outside of city limits

¨Permits and inspect all excavations performed by outside contractors on Ector County maintained roads

   

Traffic Operations/Airport/
Parks Section 
Supervisor: 
Luis Esquivel

Services:

¨Installing and maintaining traffic signage in compliance with the T.M.U.T.C.D.

¨Striping center lines and edge lines of roadway, and parking lots of all county business buildings

¨Entering and reviewing crash reports in compliance with TxDOT CRIS User Application.

¨Developing and reviewing TCP in compliance with T.M.U.T.C.D. during roadwork and all third-party work on our R.O.W.



Equipment Services Section
Managed by: Vector Fleet Management]    
Site Manager: Paul McCright

Services:

¨  Maintenance and repair of all County motor vehicles and equipment. Click here for more information

¨ Submit Maintenance Request

¨ Fleet Fuel Card Policy

¨ Equipment Donation Policy & Procedures

¨ Fuel Card Transaction Log

¨ Essential Function for Driving

¨ Fuel Card Increase Form

 

Current Public Work Job Openings:

County Engineer

Road Maintenance Tech I

Road Maintenance Tech II

Traffic Technician II

Heavy Equipment Operator I

Heavy Equipment Operator III

Apply Online

or fill out the application below and email to

applications@ectorcountytx.gov

Application

  • 2024 Planned Projects

    • 42nd St. PH II (West Odessa) Widening from FM 1936 to Knox Ave. and Drainage Resolution at Cypress Ave.                      (Starting Date - July 2023, Tentative Completion Date - April 2025)
    • Tripp Ave PH I (West Odessa) Reconstruction of Tripp Ave from 42nd St to 16th St (Starting Date - July 2024)
    • 2024 Seal Coat (Begin June 2024 - Ongoing) Approx. 50 miles