Hardin County Permits and Fee Schedule
Permits Issued by: Floodplain Administration
Effective November 1, 2009
Updated June 21, 2024
PERMIT TYPE
|
DESCRIPTION
|
COST
|
Electrical Permit Application
|
Permit must be obtained before any type of service will be provided by Entergy or SHECO. *
|
$30.00
|
Manufactured Home Placement Permit Application |
Permit must be obtained before the home is placed in Hardin County. It is the customer, buyer, and/or home owner's responsibility to obtain this permit not the dealer or transporter.*
|
$100.00 per home |
Development Residential Permit Application |
Development- Any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials. A community must require a permit for all proposed construction or other development in the community, so that it can determine whether the construction or other development is proposed within a flood-prone area.
Before any type of development (see definition above) begins a permit must be obtained. Permit fees may be waved on non-residential outbuildings and other types of development depending on intended use of proposed structure and /or land. *
|
$100.00 for first 1,000 square feet. $25.00 per each additional 100 square feet. |
Culvert Permit Application |
All roadside culverts must be installed by Hardin County. The county does not install culverts on state highways or private roads. ** Customer furnishes culvert(s) to County specifications.
INSTALLATION FEE: First culvert, county installs at no charge. Each additional culvert, on the same property, will be installed at a charge of $400 + $50 (permit) = $450 for each culvert after the first one.
|
$50.00 per culvert |
Landscape Culvert Permit Application |
See Details on Application. |
Permit fee $50.00 per 10 ft. |
Solar Panel Installation Permit Application |
Permit Fee must be paid with company check by the installer (No Exceptions).
Residential installation only.
|
Permit fee $100.00 |
Commercial/ Industrial Development Permit Application
|
Development- Any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials. A community must require a permit for all proposed construction or other development in the community, so that it can determine whether the construction or other development is proposed within a flood-prone area.
Before any type of development (see definition above) begins a permit must be obtained. Permit fees may be waved on non-residential outbuildings and other types of development depending on intended use of proposed structure and /or land. *
|
See Details on Application
|
Development Subdivision Permit Application
|
This permit is required before any development is started. This permit is for public and private subdivisions.
|
$500.00 plus
$50.00 per lot
|
Industrial Tower and Pipeline Permit Application
|
This permit applies to oil/gas industries, pipeline activity and communications towers, etc. |
Contact permit office for fees |
November 1st, 2009
Revised June 21, 2024
*South East Texas Planning Commission Issues 911 addresses please contact them @ (409) 347-1911
**For culverts alongside the state highways please call Texas Dept. of Transportation @ (409) 246-2300
Permit requests inside a Special Flood Hazard Area must comply with the Hardin County Floodplain Ordinance.
FAIR HOUSING ACCESSIBILITY FIRST REQUIREMENTS
Permits Issued by: Floodplain Administration